ALE60 Data Center

An Amazon-operated San Antonio facility on Potranco Road with a property owner that differs between the tax registry and a later air permit. The permit documents backup power and fuel storage while leaving the computing load inside the building unstated.

8Sourced facts2Source records4Open gaps

What the record establishes

Owner of record
COPT San Antonio LP[1]registry read August 27th, 2026
Occupant of record
Amazon Data Services Inc.[1]registry read August 27th, 2026
Operator of record
Amazon Data Services Inc.[1]registry read August 27th, 2026
Address
7400 Potranco Road, San Antonio, Bexar County[2]
Owner and operator in the air record
Amazon Data Services, Inc.[2]as of March 11th, 2025
Primary emergency generators in the air record
14 units[2]as of March 11th, 2025
Smaller emergency generator in the air record
1 unit[2]as of March 11th, 2025
Proposed new diesel storage tanks
2 units[2]as of March 11th, 2025

What changes the reading

  • The tax registry names COPT San Antonio as owner and Amazon as occupant and operator. The later air record says Amazon owns and operates the site. The ownership difference remains unresolved rather than being silently cleaned up.[1][2]
  • One passage in the air review calls the powered site ALE sixty-one during an outage. The rest of the document identifies ALE sixty, so this reads as a copying error inside the permit review.[2]
  • Emergency generator counts describe resilience equipment. They do not measure the site's information technology capacity or normal power draw.[2]

Still not public

  • Information technology capacity and current load are not public.
  • Building area and acreage are not public.
  • Cooling design and water use are not public.
  • The ownership difference between the tax and air records is not resolved.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 27th, 2026.
  2. ALE60 Permit by Rule Technical ReviewTexas Commission on Environmental QualitypermitRead August 27th, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.