ALE62 Data Center

An Amazon-operated San Antonio facility near the Lambda Drive campus entrance. Its air record confirms current data center operations and describes the backup system, but it does not publish the computing load served by that equipment.

9Sourced facts2Source records4Open gaps

What the record establishes

Owner of record
Amazon Data Services Inc.[1]registry read August 27th, 2026
Occupant of record
Amazon Data Services Inc.[1]registry read August 27th, 2026
Operator of record
Amazon Data Services Inc.[1]registry read August 27th, 2026
Permit location
State Highway 211 about 800 feet south of Lambda Drive, Bexar County[2]
Primary emergency generators
14 units[2]as of March 10th, 2025
Nameplate rating of each primary generator
2.5 MW[2]as of March 10th, 2025
Smaller emergency generator
1 unit[2]as of March 10th, 2025
Nameplate rating of the smaller generator
0.6 MW[2]as of March 10th, 2025
Proposed new diesel storage tanks
2 units[2]as of March 10th, 2025

What changes the reading

  • The permit describes current data center operations and says the emergency generators prevent an interruption during a local power outage. That is stronger evidence of operation than the tax certification date alone.[1][2]
  • The permit locates the entrance relative to a state highway and Lambda Drive rather than giving a numbered street address. The location is published in the same form.[2]
  • Generator ratings describe emergency equipment used during testing and outages. They do not reveal the building's information technology capacity or normal demand.[2]
  • The storage tanks were proposed in a permit revision. The filing does not establish their installation.[2]

Still not public

  • Information technology capacity and current load are not public.
  • A numbered street address has not been located.
  • Building area and acreage are not public.
  • Cooling design and water use are not public.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 27th, 2026.
  2. ALE62 Permit by Rule Technical ReviewTexas Commission on Environmental QualitypermitRead August 27th, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.