AUS 01 02 03 Data Center

The first numbered facilities inside Prime Data Centers' planned Lockhart campus. County and state records tie the registry owner to the physical site, while campus figures remain broader than the three facilities named here.

18Sourced facts4Source records5Open gaps

What the record establishes

Planned critical information technology load for the full campus
384 MW[3]
Planned buildings across the full campus
8 buildings[3]
Full campus site area
205 acres[3]
Planned full campus building area
2,000,000 sq ft[3]
First listed building critical load
144 MW[3]
First listed building area
250,000 sq ft[3]
Filed cost for the first two shell buildings
$400 million[4]
Filed area for the first two shell buildings
760,000 sq ft[4]
County agreement site area
205.756 acres[2]
Filed address
1395 Bob White Road, Lockhart[4]
Current company campus address
3300 FM 2720, Lockhart[3]as of August 27th, 2026
Filed construction window
June 1st, 2026 through September 30th, 2027[4]
Electric utility named by the developer
Bluebonnet Electric Cooperative with an onsite substation[3]
Cooling design stated by the developer
Closed loop air and liquid cooling[3]
Owner of record
Lockhart Property LLC[1]registry read August 27th, 2026
Occupant of record
Paile LLC[1]registry read August 27th, 2026
Operator of record
Lockhart Property LLC[1]registry read August 27th, 2026
Certification effective
August 17th, 2026[1]

What changes the reading

  • The county agreement names Lockhart Property as developer and uses Prime's first Austin campus code. That exact company bridge connects the registry entry to Prime's Lockhart campus.[1][2][3]
  • Prime's load, acreage, building count and floor area describe the full campus. The registry entry names only the first three numbered facilities, so the full campus figures are not assigned to those facilities alone.[1][3]
  • The building filing covers the first two shells. Its cost and area do not describe the third facility named in the registry certification.[1][4]
  • The building filing leaves the tenant field blank while the later registry names Paile as occupant. A blank filing field does not contradict the current registry role.[1][4]
  • The filed and current company addresses differ. Both are retained because the public sources do not say whether the change reflects an entrance, parcel or address update.[3][4]

Still not public

  • The load and building area of the third facility are not public.
  • Delivered power and actual electrical demand are not public.
  • Construction progress and an opening date are not established.
  • The relationship between Paile and any outside computing customer is not public.
  • Expected water use and backup generation are not public.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 27th, 2026.
  2. Prime Data Centers Development AgreementCaldwell Countylocal governmentRead August 27th, 2026.
  3. Prime Data Centers Austin CampusPrime Data CenterscompanyRead August 27th, 2026.
  4. Prime Data Center AUS First Building FilingTexas Department of Licensing and Regulationlocal governmentRead August 27th, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.