Bastrop Project One

A project near Elgin with Ocean Blockchain named in every registry role. A state construction record describes several evaporative buildings plus support space, but the construction status does not establish that the site entered operation.

12Sourced facts2Source records5Open gaps

What the record establishes

Owner of record
Ocean Blockchain LLC[1]registry read August 27th, 2026
Occupant of record
Ocean Blockchain LLC[1]registry read August 27th, 2026
Operator of record
Ocean Blockchain LLC[1]registry read August 27th, 2026
Construction filing address
2048 FM 969, Elgin, Bastrop County[2]
Filed project area
150,000 sq ft[2]
Filed project cost
$10 million[2]
Evaporative buildings in the filing
4 buildings[2]
Other structures in the filing
1 warehouse and 1 office[2]
Filed construction period
October 2022 through November 2024[2]
Accessibility review state
Review complete[2]as of August 27th, 2026
Owner named in the construction filing
Central Texas Airport, LLC[2]
Tenant named in the construction filing
Kevin Hsu[2]

What changes the reading

  • The registry and the construction filing name different parties because they record different legal relationships. The registry names the certified roles, while the accessibility filing names its project owner and tenant.[1][2]
  • The filing carries an Elgin address with a postal code that does not match the city. The city and county are published as written, while the conflicting postal code is not silently treated as a reliable location.[2]
  • A completed accessibility review is not proof that construction finished, utility service began or computing equipment entered operation.[2]

Still not public

  • Current construction and operation state are not public.
  • Power capacity and measured demand are not public.
  • The relationship among the registry parties and the construction filing parties is not explained.
  • Cooling water source and measured water use are not public.
  • The reason for the conflicting postal code is not stated.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 27th, 2026.
  2. Bastrop Project Accessibility RecordTexas Department of Licensing and RegulationpermitRead August 27th, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.