Cipher Barber Lake LLC Data Center

A former bitcoin mining site at Colorado City converted to AI hosting. Fluidstack leases the whole of it under agreements Google backstops, and the state certified Anthropic as qualifying occupant.

15Sourced facts4Source records3Open gaps

What the record establishes

Critical IT load
168 MW[2]as of September 25th, 2025
Gross capacity
244 MW[2]as of September 25th, 2025
Surrounding land held for expansion
587 acres[2]as of September 25th, 2025
Total site expansion potential
500 MW[2]as of September 25th, 2025
Contracted revenue, initial term
$3 billion[2]as of September 25th, 2025
Contracted revenue with both extensions
$7 billion[2]as of September 25th, 2025
Google backstop of lease obligations
$1.4 billion[2]as of September 25th, 2025
Google warrant stake, pro forma
5.4 percent[2]as of September 25th, 2025
Estimated project cost per critical IT megawatt, low
$9 million[2]as of September 25th, 2025
Estimated project cost per critical IT megawatt, high
$11 million[2]as of September 25th, 2025
Location
Colorado City, Texas[2]
Initial colocation term
10 years[2]as of September 25th, 2025
Extension options
2 options[2]as of September 25th, 2025
Length of each extension option
5 years[2]as of September 25th, 2025
Expected delivery
September of 2026[2]as of September 25th, 2025

What changes the reading

  • A later agreement that autumn took Fluidstack to the entire capacity of the site. Cipher Mining rebranded to Cipher Digital the following spring as its business moved from mining to hosting.[3][4]November 7th, 2025
  • Google received warrants alongside the backstop, so its exposure here is both as guarantor and as a shareholder in the landlord.[2]

Still not public

  • Building square footage is not public.
  • Cooling design is not public.
  • Substation and interconnection detail is not public.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 21st, 2026.
  2. Cipher Mining Signs 168 MW, 10-Year AI Hosting Agreement with FluidstackCipher Mining Inc. via SEC EDGARfilingRead August 21st, 2026.
  3. Fluidstack signs additional lease with Cipher Mining in Texas, backed by GoogleData Center Dynamicstrade pressRead August 21st, 2026.
  4. From Bitcoin to Big Data, Inside Cipher's Hyperscale Power PlayDisruption Bankingtrade pressRead August 21st, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.