Cutten Data Center

A Serverfarm campus in northwest Houston with two existing buildings and a new building under construction. Public records use two neighboring street numbers, and the construction scopes are kept separate so an expansion is not mistaken for the certified building.

9Sourced facts6Source records4Open gaps

What the record establishes

Owner, occupant and operator of record
SF HOUC, LLC holds 3 roles in the registry[1]as of August 27th, 2026
Federal inspection address
15515 Cutten Road, Houston, Texas 77070[2]as of February 28th, 2025
Existing campus renovation area
264,514 sq ft[3]
Initial existing campus renovation cost
$3 million[3]
Second existing campus renovation cost
$137.2 million[4]
New CTX2 building area
438,000 sq ft[5]
New CTX2 total capacity
60 MW[6]
New CTX2 capacity expected for first occupancy
36 MW[6]as of September 30th, 2027
Certification effective
October 10th, 2024[1]

What changes the reading

  • The federal inspection record uses the lower Cutten Road number. State construction filings use the higher number for one phase and both numbers for another. The difference is preserved because the public sources do not explain the parcel boundary.[2][3][4][5]
  • The existing campus work and the new building are separate scopes. The new building's capacity and floor area are not assigned to the older certification.[1][3][4][5][6]
  • Serverfarm says the new building will use a closed loop air cooled chiller system.[6]
  • The company says the design prevents water evaporation.[6]
  • The claim belongs to the expansion and does not establish cooling in the existing buildings.[6]

Still not public

  • The parcel boundary behind the two street numbers is not explained.
  • The certified building's delivered power and actual demand are not public.
  • The existing buildings' cooling design and measured water use are not public.
  • The tenant behind the renovation work is not identified.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 27th, 2026.
  2. Inspection Detail for SF HOUC LLCOccupational Safety and Health AdministrationfilingRead August 27th, 2026.
  3. Serverfarm Project LonghornTexas Department of Licensing and RegulationfilingRead August 27th, 2026.
  4. Serverfarm Project Longhorn Phase TwoTexas Department of Licensing and RegulationfilingRead August 27th, 2026.
  5. Serverfarm CTX2Texas Department of Licensing and RegulationfilingRead August 27th, 2026.
  6. CTX2 Topping OutServerfarmcompanyRead August 27th, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.