Denton Data Center

A Core Scientific site north of Dallas, contracted to CoreWeave under a twelve year term before CoreWeave bought the company outright. Its row carries no owner of record at all, which only four rows in this registry do.

11Sourced facts3Source records4Open gaps

What the record establishes

Critical IT load once the contracted power is in
260 MW[2]as of February 26th, 2025
Additional contracted power in that announcement
70 MW[2]as of February 26th, 2025
Additional contracted revenue at this site
$1.2 billion[2]as of February 26th, 2025
Capital Core Scientific committed to fund
$104 million[2]as of February 26th, 2025
Initial contract term
12 years[2]
Renewal options
2 options[2]
Length of each renewal option
5 years[2]
Occupant of record
Coreweave Compute Acquisition Co V LLC[1]registry read August 21st, 2026
Operators of record
Core Scientific, Inc. / Coreweave, Inc.[1]as of September 19th, 2024
Owner of record
None is listed[1]registry read August 21st, 2026
Location
Denton, Denton County, north of Dallas[2]

What changes the reading

  • The occupant of record is a numbered acquisition company rather than CoreWeave itself, and CoreWeave appears separately as an operator. Occupant is a position in an exemption filing. It is not a tenant and it is not a brand.[1]
  • An empty owner column is rare here and it is information. Whoever holds the building did not claim that position in the filing, and the registry does not require the reader to be told why.[1]

Still not public

  • Square footage and acreage are not public.
  • No owner of record is listed, so the landlord is not in the record.
  • What the site draws today, as against what is contracted, is not public.
  • Whether the certification survived the acquisition unchanged is not stated.

Source trail

  1. Certified Data CentersTexas Comptroller of Public AccountsfilingRead August 21st, 2026.
  2. Core Scientific and CoreWeave Announce $1.2 Billion Expansion at Denton, TX SiteCore ScientificcompanyRead August 21st, 2026.
  3. Core Scientific to Provide CoreWeave up to 16 MW of Data Center InfrastructureCore Scientific, filed with the SEC on Form 8-KfilingRead August 21st, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.