A planned Edged Energy campus on the west side of Fort Worth. City incentive records, a state building filing, and the developer's campus page describe the same address, while each record covers a different part of the proposed investment.
13Sourced facts4Source records5Open gaps
What the record establishes
- Planned critical information technology load
- 196 MW[4]
- Company campus area
- 186 acres[4]
- Projected real property improvements
- $570 million[2]
- Projected business personal property
- $525 million[2]
- Filed first building cost
- $300 million[3]
- Filed first building area
- 488,770 sq ft[3]
- Filed address
- 9999 Chapin School Road, Fort Worth[3]
- Filed construction window
- July 27th, 2026 through December 30th, 2027[3]
- Cooling design claimed by the developer
- Glycol heat transfer and air cooled chillers described as using 0 gallons of cooling water[4]
- Backup design claimed by the developer
- Battery backup with N plus one redundancy[4]
- Owner and occupant of record
- EDC Fort Worth, LLC[1]as of August 27th, 2026
- Operators of record
- EDC Fort Worth, LLC, CDE Acquisitions, LLC, and EDC OPCO, LLC[1]as of August 27th, 2026
- Certification effective
- January 9th, 2026[1]
What changes the reading
- The city figures are proposed taxable investments tied to an incentive process. They are not audited construction spending.[2]
- The state filing covers one building. Its cost should not be added to the city campus figures because the scopes may overlap.[2][3]
- The developer's cooling and backup descriptions are design claims. They do not establish measured performance after the campus opens.[4]
- The filed end date is a project schedule and not an operating date. The public records reviewed here do not establish that the campus is energized.[3]
Still not public
- A computing customer has not been named.
- Contracted and delivered utility power are not public.
- The number and sequence of planned buildings are not established.
- Expected employee water use is not public.
- A confirmed opening date is not public.
Source trail
- Data Center ListsTexas Comptroller of Public Accounts
- Tax Abatement Public Notice for EDC Fort WorthCity of Fort Worth
- Edged Energy Outpost Project DetailsTexas Department of Licensing and Regulation
- Dallas Data Center CampusEdged Energy
The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.