What the record establishes

Planned critical information technology load
196 MW[4]
Company campus area
186 acres[4]
Projected real property improvements
$570 million[2]
Projected business personal property
$525 million[2]
Filed first building cost
$300 million[3]
Filed first building area
488,770 sq ft[3]
Filed address
9999 Chapin School Road, Fort Worth[3]
Filed construction window
July 27th, 2026 through December 30th, 2027[3]
Cooling design claimed by the developer
Glycol heat transfer and air cooled chillers described as using 0 gallons of cooling water[4]
Backup design claimed by the developer
Battery backup with N plus one redundancy[4]
Owner and occupant of record
EDC Fort Worth, LLC[1]as of August 27th, 2026
Operators of record
EDC Fort Worth, LLC, CDE Acquisitions, LLC, and EDC OPCO, LLC[1]as of August 27th, 2026
Certification effective
January 9th, 2026[1]

What changes the reading

  • The city figures are proposed taxable investments tied to an incentive process. They are not audited construction spending.[2]
  • The state filing covers one building. Its cost should not be added to the city campus figures because the scopes may overlap.[2][3]
  • The developer's cooling and backup descriptions are design claims. They do not establish measured performance after the campus opens.[4]
  • The filed end date is a project schedule and not an operating date. The public records reviewed here do not establish that the campus is energized.[3]

Still not public

  • A computing customer has not been named.
  • Contracted and delivered utility power are not public.
  • The number and sequence of planned buildings are not established.
  • Expected employee water use is not public.
  • A confirmed opening date is not public.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 27th, 2026.
  2. Tax Abatement Public Notice for EDC Fort WorthCity of Fort Worthlocal governmentRead August 27th, 2026.
  3. Edged Energy Outpost Project DetailsTexas Department of Licensing and Regulationlocal governmentRead August 27th, 2026.
  4. Dallas Data Center CampusEdged EnergycompanyRead August 27th, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.