A purpose built AI campus at Abernathy, north of Lubbock, developed by TeraWulf with Fluidstack and backed financially by Google. The state certified Anthropic as its qualifying occupant. It is one of two unrelated data center campuses in the same small town.
8Sourced facts3Source records4Open gaps
What the record establishes
- Critical IT load
- 168 MW[2]
- Gross capacity
- 240 MW[3]
- Site area
- 120 acres[3]
- TeraWulf ownership of the joint venture
- 50.1 percent[2]as of July 6th, 2026
- TeraWulf invested capital
- $450 million[2]as of July 6th, 2026
- Google lease backstop
- $1.3 billion[3]
- Location
- Abernathy, Hale County, north of Lubbock[3]
- Delivery
- Expected in the second half of 2026[3]
What changes the reading
- The Comptroller certified Anthropic, PBC as qualifying occupant. TeraWulf's own release places an Anthropic lease at a different campus and describes its majority interest in the Abernathy joint venture as sold to Fluidstack. Both statements can be true about different things and this record does not adjudicate between them.[1][2]July 6th, 2026
- Google is the financial anchor rather than a tenant, backstopping the lease obligations so the project could raise debt.[3]
Still not public
- Building square footage is not public.
- Cooling design is not public.
- Generator count and permit numbers are not public.
- Interconnection detail is not public.
Source trail
- Data Center ListsTexas Comptroller of Public Accounts
- TeraWulf Announces Anthropic Lease at Justified Data Campus and Sale of Majority Interest in Abernathy Joint Venture to FluidstackTeraWulf Inc.
- TeraWulf and Fluidstack to develop Texas data center in Google-backed dealData Center Dynamics
The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.