Hackberry Data Center

A planned data center load beside an existing solar plant northwest of Fort Stockton. State utility filings link the exact registry owner to a public parent, while the shared connection and proposed net metering remain under review.

11Sourced facts4Source records5Open gaps

What the record establishes

Planned data center load
180 MW[2]
Existing colocated solar capacity
204 MW[2]
Location described in the utility case
Pecos County about 25 miles northwest of Fort Stockton[3]
Proposed grid arrangement
Shared point of interconnection and net metering with Taygete II Solar[2]
Distribution service provider
Texas New Mexico Power Company[2]
Corporate relationship stated in testimony
Silver Basin Digital Infrastructure LLC is wholly owned by Hut 8 Corp.[3]
Utility case status
Pending with no final order shown[4]as of August 27th, 2026
Owner of record
Silver Basin Digital Infrastructure LLC[1]registry read August 27th, 2026
Occupant of record
American Bitcoin Operating LLC[1]registry read August 27th, 2026
Operator of record
Silver Basin Digital Infrastructure LLC[1]registry read August 27th, 2026
Certification effective
December 15th, 2025[1]

What changes the reading

  • The utility case calls the computing project Silver Basin Load. The filing links the exact registry owner and operator to that project even though it does not use the registry facility name.[1][2][3]
  • The solar plant is existing generation beside a planned load. Shared metering would not make solar a continuous or exclusive power source for the data center.[2]
  • A pending utility application does not establish that the data center is built, energized or operating.[2][4]
  • The registry names American Bitcoin as occupant, while the utility testimony describes Hut Eight personnel operating the Silver Basin project. The public records do not explain that division of work.[1][3]

Still not public

  • A street address and site acreage are not public.
  • Construction status and an opening date are not established.
  • Cooling design and expected water use are not public.
  • Backup generation and battery plans are not public.
  • The working relationship between the registry occupant and operator is not explained.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 27th, 2026.
  2. Application for Approval of Net Metering ArrangementPublic Utility Commission of TexasfilingRead August 27th, 2026.
  3. Direct Testimony of Silver Basin Digital InfrastructurePublic Utility Commission of TexasfilingRead August 27th, 2026.
  4. Docket 59115 FilingsPublic Utility Commission of TexasfilingRead August 27th, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.