Microsoft's Lambda Road certification groups five building labels. Current environmental records describe a wider seven-building campus, and the construction register splits the early work across several filings.
12Sourced facts5Source records4Open gaps
What the record establishes
- Owner, occupant and operator of record
- Microsoft Corporation[1]as of December 15th, 2015
- Current campus address in the air review
- 15434 Lambda Drive, San Antonio, Bexar County[2]
- Building labels named in the certification
- 5 buildings[1]
- Buildings at the current campus in the air review
- 7 buildings[2]
- SAT09 filed construction cost
- $90 million[3]
- SAT09 data center area in the filing
- 159,000 sq ft[3]
- SAT09 office and loading area in the filing
- 28,000 sq ft[3]
- SAT10 filed construction cost
- $90 million[4]
- SAT10 data center area in the filing
- 159,000 sq ft[4]
- SAT10 office and loading area in the filing
- 17,000 sq ft[4]
- Later three-building filing area
- 675,000 sq ft[5]
- Later three-building filed construction cost
- $62 million[5]
What changes the reading
- The later construction record is titled for four building labels, but its scope describes three buildings. This page keeps the filing's figures together and does not assign them to individual labels.[5]
- The same construction record assigns the project to Medina County. The current air review places the wider Lambda campus in Bexar County. The records do not explain the county difference.[2][5]
- The air review names two additional building labels beyond the range in this certification. They belong to the current campus description, but this page does not fold them into the certified group.[1][2]
Still not public
- The exact certification to building mapping is not stated.
- Current information technology load is not public.
- Water use and cooling design are not public.
- Current operating status for each building is not public.
Source trail
- Data Center ListsTexas Comptroller of Public Accounts
- Technical Review for Project 38511Texas Commission on Environmental Quality
- SAT09 Data CenterTexas Department of Licensing and Regulation
- SAT10 Data CenterTexas Department of Licensing and Regulation
- Microsoft Data Center SAT11-14Texas Department of Licensing and Regulation
The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.