Milam County Data Center Phase 2
The second certified building company inside SB Energy's OpenAI campus near Burlington. The wider campus is under construction, but public records do not isolate the size, schedule or power demand of this phase.
9Sourced facts4Source records5Open gaps
What the record establishes
- Full site lease capacity
- 1.2 GW[2]as of January 9th, 2026
- Construction jobs stated for the full campus
- 10,000 jobs[3]
- Campus location
- Near Burlington in Milam County[3]
- Computing customer named for the campus
- OpenAI[2]as of January 9th, 2026
- Company status for the wider campus
- Under construction[4]as of August 27th, 2026
- Owner of record
- MDC Building 2, LLC[1]registry read August 27th, 2026
- Occupant of record
- Orion DC I, LLC[1]registry read August 27th, 2026
- Operator of record
- Milam County DC, LLC[1]registry read August 27th, 2026
- Certification effective
- June 10th, 2026[1]
What changes the reading
- The lease capacity belongs to the full Milam County site. It is not assigned to the second building because the developer does not publish a building level load split.[1][2]
- The construction employment figure also covers the wider campus. It is not a current headcount and is not treated as a commitment for this phase alone.[3]
- The first phase has a separate building filing with cost, area and data hall figures. Those numbers are not carried into this record because no separate filing for the second building was found.[1][4]
- The developer publicly names OpenAI for the campus while the registry names Orion as occupant. The public sources do not explain the legal relationship between those names.[1][2]
Still not public
- The information technology load of the second building is not public.
- A separate building area, cost and construction schedule are not public.
- Delivered power and actual electrical demand are not public.
- The relationship between the registry occupant and OpenAI is not public.
- Cooling design and measured water use are not public.
Source trail
- Data Center ListsTexas Comptroller of Public Accounts
- OpenAI and SoftBank Group Partner with SB EnergySB Energy
- Milam County Community Case StudySB Energy
- SB Energy Data CentersSB Energy
The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.