Texas data centers Every registered facility.
Nexus Data Centers
A Hubbard campus that runs on its own gas turbines rather than on the grid. The registry shows the design before any coverage does, because it lists a power company for every building alongside the building itself.
8Sourced facts3Source records4Open gaps
What the record establishes
- Filed power capacity
- 600 MW[2]
- Permitted building area
- 491,000 sq ft[3]
- Campus area
- 2,900 acres[2]
- Stated campus ambition
- 7.7 GW[2]
- Nexus entities in the registry
- 16 units[1]
- Address
- 357 HCR 3372, Hubbard, Hill County[3]
- Power design
- Behind the meter, on site natural gas turbines, independent of the grid[2]
- Construction window
- January of 2026 to October of 2027[3]
What changes the reading
Still not public
- The campus ambition figure is the developer's own and has no executed contract behind it here.
- No tenant is named in the registry or in the coverage read.
- Water use for the turbines and the halls is not public.
- Which of the sixteen entities the single certification covers is not stated.
Source trail
- Data Center ListsTexas Comptroller of Public Accounts
- 600MW natural gas-powered data center campus proposed in Hubbard, TexasData Center Dynamics
- Nexus Data Centers Files Permit for a Data Center in Hubbard, TexasMLQ News
The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.