Microsoft occupies one certified building inside QTS's Irving campus. QTS publishes both building figures and larger current campus figures, which makes it possible to keep the certified building distinct from the site around it.

12Sourced facts4Source records4Open gaps

What the record establishes

Owner of record
QTS Irving DC3, LLC[1]registry read August 27th, 2026
Occupant of record
Microsoft Corporation[1]registry read August 27th, 2026
Operators of record
QTS Irving DC3, LLC and Quality Technology Services, LLC[1]as of February 9th, 2024
DC3 address
6351 Longhorn Drive, Irving, Dallas County[2]
DC3 building area
415,900 sq ft[3]
DC3 data center footprint
231,700 sq ft[3]
DC3 planned critical power
43 MW[3]
Current Irving campus area
56 acres[2]as of August 27th, 2026
Current campus critical power, stated as more than
165 MW[2]as of August 27th, 2026
Facilities on the current campus
6 buildings[2]as of August 27th, 2026
DC3 redesign filed construction cost
$35 million[4]
Area affected by the DC3 redesign filing
408,972 sq ft[4]

What changes the reading

  • The building area, data center footprint and redesign area measure different things. The first describes the building, the second describes technical space, and the third describes the area touched by one construction filing.[3][4]
  • The current power and acreage figures cover QTS's full Irving campus. They are not assigned to the Microsoft building alone.[2][3]
  • QTS labels the building's critical power as planned. This page does not treat that figure as delivered load.[3]

Still not public

  • Microsoft's contracted or active load is not public.
  • The building's current occupancy date is not public.
  • Water use attributable to this building is not public.
  • The registry does not identify which parts of the building Microsoft occupies.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 27th, 2026.
  2. Irving Data Center CampusQTS Data CenterscompanyRead August 27th, 2026.
  3. QTS Irving Data Center DC3QTS Data CenterscompanyRead August 27th, 2026.
  4. QTS Irving DC3 RedesignTexas Department of Licensing and RegulationfilingRead August 27th, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.