STN's planned single tenant computing campus in West Texas. The company publishes a dense modular design and an initial deployment target, while the exact site, utility, customer and construction status remain private.

13Sourced facts2Source records5Open gaps

What the record establishes

Planned campus capacity
1.6 GW[2]
Initial planned deployment
400 MW[2]
Data halls in each pod
24 units[2]
Factory built modules in each system
5 units[2]
Company location
West Texas[2]
Configurable data hall density
25 MW, 45 MW, or 65 MW[2]
Cooling design
Direct to rack liquid cooling[2]
Utility design
1 utility feed[2]
Tenant design
1 tenant campus[2]
Computing hardware named in the design
NVIDIA B300, GB300, and Vera Rubin[2]
Owner of record
RXT POWER, LLC and STN INCORPORATED[1]registry read August 27th, 2026
Occupant and operator of record
RXT POWER, LLC[1]
Certification effective
June 18th, 2026[1]

What changes the reading

  • The registry and company page share the Project Landman name and STN company identity. That provides a direct bridge between the certification and the published design.[1][2]
  • Capacity, hall density and hardware support are company design claims. They do not establish delivered utility service or an operating campus.[2]
  • STN says its factory built modules can move from delivery to live service within days. That describes the module design and is not treated as a schedule for the full campus.[2]
  • The page describes a single tenant layout but does not identify the customer. The registry occupant is a project company rather than a named computing customer.[1][2]

Still not public

  • The county, street address and campus boundary are not public.
  • The utility and grid connection are not named.
  • Construction progress and an opening date are not established.
  • The computing customer has not been named.
  • Expected water use and backup generation are not public.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 27th, 2026.
  2. Project LandmanSTN IncorporatedcompanyRead August 27th, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.