Stream DFW VII Data Center

A Garland campus that began as a single Stream building and later grew around it. The state record ties the original certification to a cloud tenant that Stream does not name publicly, while current company material uses a newer campus code and larger figures.

15Sourced facts4Source records4Open gaps

What the record establishes

Owner of record
SDC DFW VII LP[1]registry read August 27th, 2026
Occupant of record
OBOE LLC[1]registry read August 27th, 2026
Operator of record
SDC Technology Services, LLC[1]registry read August 27th, 2026
Address
1813 Lookout Drive, Garland, Dallas County[2]
Site area
22.66 acres[2]
Original building area
138,132 sq ft[2]
Original raised floor area
75,000 sq ft[2]
Original critical load design
15 MW[2]
Original expansion design
30 MW[2]
Utility feeds
2 units[2]
Capacity of each utility feed
40 MW[2]
Current campus area
275,000 sq ft[3]as of August 27th, 2026
Current critical capacity
43 MW[3]as of August 27th, 2026
Current Stream campus code
DFWA-1[3]as of August 27th, 2026
Original building commissioned
January 2020[4]

What changes the reading

  • The smaller figures describe the original building. Stream's current page describes the expanded campus, so they are dated snapshots rather than a measurement conflict.[2][3][4]
  • Stream says the expanded facility is fully leased to a major cloud customer. The company does not name that customer, and the state registry does not explain who sits behind OBOE.[1][3]
  • The utility feed ratings describe available infrastructure. They are not a report of the tenant's measured demand.[2]

Still not public

  • The cloud tenant behind OBOE has not been named in a reliable public source.
  • The tenant's occupied share and measured load are not public.
  • Current water use is not public.
  • The public record does not separate the original building from every later campus addition.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 27th, 2026.
  2. DFW VII Garland Specification SheetStream Data CenterscompanyRead August 27th, 2026.
  3. Dallas Data CentersStream Data CenterscompanyRead August 27th, 2026.
  4. Stream Commissions Garland Hyperscale Data CenterStream Data CenterscompanyRead August 27th, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.