Switch AUS 4
A Switch building certified with CoreWeave as occupant. Its operator column is the strongest evidence in this registry that operator is a legal position rather than a description of who runs a building.
What the record establishes
- Owner of record
- Switch, LTD[1]registry read August 21st, 2026
- Occupant of record
- Coreweave, Inc.[1]registry read August 21st, 2026
- Operators of record
- Switch, LTD / Coreweave Compute Acquistion Co. III, LLC / Coreweave Financing DDTL V-V, LLC[1]as of June 26th, 2025
- What the name suggests
- The airport code for Austin[1]
- Switch's Texas campus
- The Rock, beside Dell's headquarters at Round Rock, north of Austin[2]
- Floor area Switch announced for that campus
- 1,500,000 sq ft[2]
- Address on the construction filing
- 4100 SMITH SCHOOL ROAD[3]
- County on the construction filing
- Travis County[3]
What changes the reading
- One of the operators of record is a CoreWeave financing vehicle. A lending structure does not run a data hall. It holds a position in the exemption filing and that is what the operator column records. Anyone reading this registry as an operations directory will get it wrong here first.[1]
- The state misspells one operator where the same family of entities is spelled correctly elsewhere. Resolution here merges on case, punctuation and corporate suffix only. So that typo currently splits one company in two and is written down rather than guessed at.[1]
- Switch's Texas campus is The Rock, beside Dell's headquarters at Round Rock, which is north of Austin rather than in it. The name is a hint and the record gives no location, so nothing here says where this building stands.[1][2]
Still not public
- No capacity figure is public.
- No announcement from Switch or CoreWeave names this building.
- What CoreWeave takes, as against the building's total, is not public.
- The certification carries no county or address, and the ones here come from the construction filing.
- Acreage is not public.
- Capacity is not public.
Source trail
- Certified Data CentersTexas Comptroller of Public Accounts
- Switch Announces Fifth Prime Campus Expansion in TexasSwitch
- Texas Architectural Barriers Project SearchTexas Department of Licensing and Regulation
What was filed to build it
Texas registers every large construction project with a second agency. These filings were made by a company this record already names.
$158,100,000 across 8 filings, 718,451 sq ft.
An estimated cost at filing is not a final cost, and a filing is not proof a building went up. How this register works.