Temple Data Center

A Rowan Digital Infrastructure campus under construction in east Temple for an unnamed technology customer. Company and city records describe the first project, the wider campus, and a low water cooling plan, but those scopes are not interchangeable.

15Sourced facts4Source records5Open gaps

What the record establishes

Planned campus capacity
300 MW[2]
Company campus area
700 acres[2]
Planned data centers
6 facilities[3]
Minimum investment stated for the first project
$700 million[2]
Construction jobs stated by the developer
600 jobs[2]
Permanent positions stated by the developer
40 jobs[2]
Reinvestment zone area
554 acres[4]
Utility provider named by the developer
Oncor Electric Delivery Company[2]
Closed loop system initial charge
1 million to 2 million gallons[3]
Maximum daily employee water estimate
4,000 gallons for ordinary facilities[3]
Company status
Construction underway with operations expected in 2027[2]as of January 5th, 2026
Owner of record
Rowan Temple LLC[1]registry read August 27th, 2026
Occupant of record
Polmer LLC[1]registry read August 27th, 2026
Operator of record
Rowan Temple LLC[1]registry read August 27th, 2026
Certification effective
January 21st, 2026[1]

What changes the reading

  • Rowan describes the customer only as a top global technology company. The public sources reviewed here do not establish that Polmer is a public brand or identify its parent.[1][2]
  • The company campus acreage is broader than the city reinvestment zone. The two figures describe different boundaries and should not be reconciled into one site measurement.[2][4]
  • The water figures are design estimates. The larger amount is an initial system charge that Rowan says will recirculate, while the daily amount concerns ordinary employee uses.[3]
  • The expected operating year is a company schedule. It is not evidence that the campus has passed final inspection or begun serving load.[2]

Still not public

  • The outside computing customer has not been named.
  • Delivered power and actual electrical demand are not public.
  • The source of the initial cooling water charge is not public.
  • Backup generation and battery plans are not public.
  • A confirmed opening date is not public.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 27th, 2026.
  2. Construction Begins on 300 MW Temple Data CenterRowan Digital InfrastructurecompanyRead August 27th, 2026.
  3. Temple Campus Frequently Asked QuestionsRowan Digital InfrastructurecompanyRead August 27th, 2026.
  4. Reinvestment Zone Public NoticeCity of Templelocal governmentRead August 27th, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.