Texas AI Docket

Texas data centers Every registered facility.

Certified facility dossier

Temple Green Data Center

A Temple campus developed by Rowan for Rhodium's immersion-cooled bitcoin mining operation. Public documents describe the whole campus plan, the tenant's lease design, one construction filing and a partial commissioning milestone.

16Sourced facts5Source records4Open gaps

What the record establishes

Owner of record
Rowan Moriah LLC.[1]registry read August 27th, 2026
Occupant of record
Rhodium Renewables LLC[1]registry read August 27th, 2026
Operator of record
Rowan Moriah LLC.[1]registry read August 27th, 2026
Construction address
2810 Bob White Road, Bell County[3]
Planned campus capacity
500 MW[2]
Planned first phase capacity
200 MW[2]
Announced investment
$300 million[2]
Announced permanent jobs
20 jobs[2]
Announced campus building area
135,000 sq ft[2]
Announced site area
32 acres[2]
Filed construction cost
$70 million[3]
Filed construction area
133,274 sq ft[3]
Interconnected powered shells in the filing
3 buildings[3]
Capacity covered by the original lease design
225 MW[4]
Capacity under a nonbinding letter in that design
40 MW[4]
Capacity deployed for commissioning and testing
50 MW[5]as of December 31st, 2022

What changes the reading

  • The campus announcement, lease design and construction filing cover different scopes. Their power, cost and area figures are shown separately and are not added together.[2][3][4]
  • The construction filing describes three connected shells for mining equipment with immersion cooling. Its closed accessibility status does not by itself establish full operation.[3]
  • A later SEC filing says part of the planned capacity had been deployed for commissioning and testing. The same filing says later construction milestones remained unfinished.[5]
  • Rhodium later said construction delays gave it a right to end the lease. The current tax registry still names Rhodium as occupant, so the present lease status remains unresolved.[1][5]

Still not public

  • Current operational capacity is not public.
  • The present status of the Rhodium lease is not resolved.
  • The completed share of the full campus plan is not public.
  • Current water use is not public.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 27th, 2026.
  2. Rowan Green Data to Build New Hyperscale Campus in TempleTemple Economic Development Corporationlocal governmentRead August 27th, 2026.
  3. Temple Data CenterTexas Department of Licensing and RegulationfilingRead August 27th, 2026.
  4. Rhodium Enterprises Registration StatementU.S. Securities and Exchange CommissionfilingRead August 27th, 2026.
  5. Rhodium Business Combination Registration StatementU.S. Securities and Exchange CommissionfilingRead August 27th, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.