Texas data centers Every registered facility.
Temple Green Data Center
A Temple campus developed by Rowan for Rhodium's immersion-cooled bitcoin mining operation. Public documents describe the whole campus plan, the tenant's lease design, one construction filing and a partial commissioning milestone.
16Sourced facts5Source records4Open gaps
What the record establishes
- Owner of record
- Rowan Moriah LLC.[1]registry read August 27th, 2026
- Occupant of record
- Rhodium Renewables LLC[1]registry read August 27th, 2026
- Operator of record
- Rowan Moriah LLC.[1]registry read August 27th, 2026
- Construction address
- 2810 Bob White Road, Bell County[3]
- Planned campus capacity
- 500 MW[2]
- Planned first phase capacity
- 200 MW[2]
- Announced investment
- $300 million[2]
- Announced permanent jobs
- 20 jobs[2]
- Announced campus building area
- 135,000 sq ft[2]
- Announced site area
- 32 acres[2]
- Filed construction cost
- $70 million[3]
- Filed construction area
- 133,274 sq ft[3]
- Interconnected powered shells in the filing
- 3 buildings[3]
- Capacity covered by the original lease design
- 225 MW[4]
- Capacity under a nonbinding letter in that design
- 40 MW[4]
- Capacity deployed for commissioning and testing
- 50 MW[5]as of December 31st, 2022
What changes the reading
- The campus announcement, lease design and construction filing cover different scopes. Their power, cost and area figures are shown separately and are not added together.[2][3][4]
- The construction filing describes three connected shells for mining equipment with immersion cooling. Its closed accessibility status does not by itself establish full operation.[3]
- A later SEC filing says part of the planned capacity had been deployed for commissioning and testing. The same filing says later construction milestones remained unfinished.[5]
- Rhodium later said construction delays gave it a right to end the lease. The current tax registry still names Rhodium as occupant, so the present lease status remains unresolved.[1][5]
Still not public
- Current operational capacity is not public.
- The present status of the Rhodium lease is not resolved.
- The completed share of the full campus plan is not public.
- Current water use is not public.
Source trail
- Data Center ListsTexas Comptroller of Public Accounts
- Rowan Green Data to Build New Hyperscale Campus in TempleTemple Economic Development Corporation
- Temple Data CenterTexas Department of Licensing and Regulation
- Rhodium Enterprises Registration StatementU.S. Securities and Exchange Commission
- Rhodium Business Combination Registration StatementU.S. Securities and Exchange Commission
The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.