TX 307 Data Center

One of three Frontier buildings filed to the campus's larger floor plan and the second to last of the ten in the construction schedule.

13Sourced facts4Source records4Open gaps

What the record establishes

Data centers announced for the campus
10 buildings[3]as of August 19th, 2025
Campus capacity announced
1.4 GW[3]as of August 19th, 2025
Campus land announced
1,200 acres[3]as of August 19th, 2025
Campus floor area announced
3,700,000 sq ft[3]as of August 19th, 2025
Announced investment
$25 billion[3]as of August 19th, 2025
Workforce announced across construction and operations
5,000 workers[3]as of August 19th, 2025
Owner and operator of record
Vantage Data Centers TX307, LLC[1]as of October 8th, 2025
Occupant of record
Oracle America Cloud Services[1]registry read August 22nd, 2026
Where the construction filing puts it
Shackelford County, under an Abilene mailing address[2]
Scheduled delivery of the first building on the campus
Second half of 2026[3]as of August 19th, 2025
Address on the construction filing
246 PR 1604 BLDG 7[2]
Building number in the filing
TX307[2]
Campus cooling
Liquid cooling on a closed loop chiller system[3]

What changes the reading

  • Two campuses in this record answer to the name Abilene and they are not in the same county. This one sits in Shackelford County under an Abilene mailing address, which is ordinary for a rural site served by a distant post office. The Lancium Clean Campus, which opened the Stargate program, is inside Abilene in Taylor County. Both are occupied by the same Oracle entity, so a reader working from the city line alone would take them for one place.[1][2]
  • The record moved after the announcement here. Vantage unveiled the campus in August and the Comptroller made all ten certifications effective on a single day that October. On the Lancium campus the order runs the other way.[1][3]
  • The three larger buildings are spread across the schedule rather than grouped, which is visible in the filed start dates below.[2]
  • The construction register arrives at the same campus size from the other side. Ten companies filed ten buildings separately. Their floor areas together come to very nearly the total Vantage announced before the first of them was filed, and neither register was built to check the other.[2][3]

Still not public

  • Vantage has not confirmed that these numbered entities are the announced campus.
  • Per building capacity is not public.
  • Energization dates per building are not public.
  • The certification carries no address, and the one here comes from the construction filing.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 22nd, 2026.
  2. Texas Architectural Barriers Project SearchTexas Department of Licensing and RegulationfilingRead August 22nd, 2026.
  3. Vantage Data Centers Unveils Plans for Frontier, a Mega-campus in TexasVantage Data CenterscompanyRead August 22nd, 2026.
  4. Announcing The Stargate ProjectOpenAIcompanyRead August 22nd, 2026.

What was filed to build it

Texas registers every large construction project with a second agency. These filings were made by a company this record already names.

$1.15 billion across 1 filing, 398,117 sq ft.

2026$1.15 billion398,117 sq ftVantage DC Abilene - TX3 - Project FrontierAbilene

An estimated cost at filing is not a final cost, and a filing is not proof a building went up. How this register works.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.