TX21-22 Data Center

Two Vantage buildings at the same San Antonio address with Oracle named in the tax record. Public construction filings describe the first building, a tenant fitout, and a second building on different schedules, but do not establish that either is operating.

15Sourced facts4Source records5Open gaps

What the record establishes

First building area
360,000 sq ft[2]
First building filed cost
$157 million[2]
Information technology fitout named in the first filing
16 MW[2]
Later tenant fitout area
162,785 sq ft[3]
Later tenant fitout cost
$135 million[3]
Second building area
214,526 sq ft[4]
Second building filed cost
$272.1 million[4]
Address
5207 Rogers Road, San Antonio, Bexar County[2]
First building filed window
December 11th, 2023 through June 1st, 2025[2]
Later tenant fitout filed window
December 1st, 2025 through June 2nd, 2026[3]
Second building filed window
October 22nd, 2025 through June 15th, 2027[4]
Owners of record
Vantage Data Centers TX21, LLC and Vantage Data Centers TX22, LLC[1]as of August 27th, 2026
Occupant of record
Oracle America Cloud Services, LLC[1]registry read August 27th, 2026
Operator of record
Vantage Data Centers Management Company, LLC[1]registry read August 27th, 2026
Certification effective
November 5th, 2025[1]

What changes the reading

  • The first building's later tenant fitout sits within the earlier core and shell. Those floor areas and costs describe overlapping work and should not be added as separate buildings.[2][3]
  • The certification combines two legal owners and one occupant under one facility name. The project filings keep the two buildings on different construction schedules.[1][2][3][4]
  • Only the first filing names a power figure.[2][4]
  • The figure concerns a fitout phase rather than total campus capacity.[2][4]
  • It is not assigned to the second building.[2][4]
  • The project forms do not name Oracle as tenant. The tax record supplies that legal role but does not say which building or data hall Oracle uses.[1][2][3][4]

Still not public

  • An operating date for either building has not been established.
  • Delivered power and actual electrical demand are not public.
  • The occupant's share of each building is not public.
  • Final construction cost and completed floor area are not public.
  • Cooling design and measured water use are not public.

Source trail

  1. Data Center ListsTexas Comptroller of Public AccountsfilingRead August 27th, 2026.
  2. Vantage TX21 Core and Shell Project DetailsTexas Department of Licensing and Regulationlocal governmentRead August 27th, 2026.
  3. Vantage TX21 Tenant Fitout Project DetailsTexas Department of Licensing and Regulationlocal governmentRead August 27th, 2026.
  4. Vantage TX22 Project DetailsTexas Department of Licensing and Regulationlocal governmentRead August 27th, 2026.

The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.