Texas data centers Every registered facility.
Whinstone US Data Center
Riot's Rockdale campus still carries the Whinstone name in the tax registry. SEC filings trace the site from a bitcoin mining acquisition to a fully owned campus with a large grid connection and a new AMD data center lease.
15Sourced facts3Source records4Open gaps
What the record establishes
- Owner of record
- Whinstone US Inc[1]registry read August 27th, 2026
- Occupant of record
- Whinstone US Inc[1]registry read August 27th, 2026
- Operator of record
- Whinstone US Inc[1]registry read August 27th, 2026
- Location
- Rockdale, Milam County[2]
- Site area described in the earlier filing
- 100 acres[2]as of August 31st, 2021
- Buildings described in the earlier filing
- 3 buildings[2]as of August 31st, 2021
- Finished area described in the earlier filing
- 190,000 sq ft[2]as of August 31st, 2021
- Developed power distribution in the earlier filing
- 300 MW[2]as of August 31st, 2021
- Land acquired outright by Riot
- 200 acres[3]as of January 16th, 2026
- Land acquisition consideration
- $96 million[3]as of January 16th, 2026
- Grid interconnection capacity
- 700 MW[3]as of January 16th, 2026
- Initial AMD critical information technology capacity
- 25 MW[3]as of January 16th, 2026
- Initial AMD lease term
- 10 years[3]as of January 16th, 2026
- Expected revenue over the initial AMD term
- $311 million[3]as of January 16th, 2026
- Potential AMD capacity with every option exercised
- 200 MW[3]as of January 16th, 2026
What changes the reading
- The registry keeps the Whinstone entity in every role. Riot's filings say Whinstone became its wholly owned subsidiary and that Riot now owns and operates the Rockdale site.[1][2][3]
- The later land figure covers the acreage Riot bought outright after operating under a ground lease. It should not be substituted for the smaller site description in the earlier filing without showing both dates.[2][3]
- The grid interconnection is a site power limit. It is not the computing load delivered to AMD or the power actually drawn by the campus.[3]
- The larger AMD figure depends on an expansion option and a right of first refusal. Only the initial capacity was under the signed lease described in the filing.[3]
Still not public
- A later filing confirming final delivery to AMD has not been located.
- The share of the campus still used for bitcoin mining is not public.
- Current metered load is not public.
- Cooling design and water consumption for the AMD space are not public.
Source trail
- Data Center ListsTexas Comptroller of Public Accounts
- Riot Blockchain Registration StatementU.S. Securities and Exchange Commission
- Riot Announces Land Acquisition and AMD Lease at RockdaleU.S. Securities and Exchange Commission
The registry entry for this facility comes from the Texas Comptroller's certified list of data centers holding a sales tax exemption. Owner, occupant and operator are roles in that filing rather than descriptions of who runs the building.