A Houston oil producer buys into an AI vendor and commits its Ward County operations to the vendor's system. What happens next?

No future date is on the record. The last dated step on it was filed on September 8th.

Open the decision.

A Texas Senate committee set a hearing on how much water data center cooling uses and whether local water providers are told. What happens next?

No future date is on the record. The last dated step on it was hearing on September 1st.

Open the decision.

A data center developer tells its shareholders what the Batch Zero list did to five of its Texas projects, and one came back in a different class than it was filed in. What happens next?

No future date is on the record. The last dated step on it was filed on September 8th.

Open the decision.

A generative AI platform at UTMB reached the UT System Regents only on its third amendment, at $9,850,000, and now covers all seven health institutions. What happens next?

No future date is on the record. The last dated step on it was hearing on August 12th.

Open the decision.

A machine scores the longer written answers on English STAAR first. What happens next?

No future date is on the record. The last dated step on it was decided on September 4th.

Open the decision.

A statewide poll finds most Texas voters oppose a data center in their own community for a second survey running. What happens next?

No future date is on the record. The last dated step on it was filed on August 13th.

Open the decision.

A three campus Texas trial tests whether a phone microphone held to the abdomen can count fetal movement by machine. What happens next?

No future date is on the record. The last dated step on it was filed on September 14th.

Open the decision.

Amarillo City Council authorizes a twenty year water supply agreement selling city water to Fermi America's Project Matador. What happens next?

No future date is on the record. The last dated step on it was signed on October 30th.

Open the decision.

Amazon and Wiwynn say they will expand the El Paso County plant that builds the racks going into AI data centers. What happens next?

No future date is on the record. The last dated step on it was filed on September 10th.

Open the decision.

Amazon selects Austin for a factory building the robotics systems used in its warehouses, and the mayor says no incentives were requested. What happens next?

No future date is on the record. The last dated step on it was ordered on August 19th.

Open the decision.

An MD Anderson and UT Medical Branch MRI model scored lower on patients it was not built on. What happens next?

No future date is on the record. The last dated step on it was filed on September 9th.

Open the decision.

Angelina County Commissioners Court adopts Resolution 010-26 asking the Legislature for authority over data centers. What happens next?

No future date is on the record. The last dated step on it was ordered on July 14th.

Open the decision.

Archer County Commissioners Court unanimously denies a tax abatement for a Dynamo Ventures data center. What happens next?

No future date is on the record. The last dated step on it was ordered on June 22nd.

Open the decision.

Asked for AI camera fire detections, Xcel counted cameras. What happens next?

No future date is on the record. The last dated step on it was filed on May 1st.

Open the decision.

Austin City Council adopted Ordinance 20260423-029 creating City Code Chapter 2-19 on surveillance technology. What happens next?

No future date is on the record. The last dated step on it was ordered on April 23rd.

Open the decision.

Austin City Council takes up a resolution to amend the land code for data centers. What happens next?

No future date is on the record. The last dated step on it was hearing on August 27th.

Open the decision.

Austin City Council takes up a resolution to write data centers into a land development code that has no definition of one. What happens next?

No future date is on the record. The last dated step on it was hearing on August 27th.

Open the decision.

Austin bars its city manager from buying any park camera or drone that depends on artificial intelligence. What happens next?

The next dated step is ordered, on December 9th, in 69 days.

Open the decision.

Blanco-Pedernales Groundwater Conservation District signed a resolution asking the Legislature to clarify district authority over data centers. What happens next?

No future date is on the record. The last dated step on it was signed on April 16th.

Open the decision.

Brazoria County Commissioners Court adopted a resolution stating conditions it wants on data center development. What happens next?

No future date is on the record. The last dated step on it was ordered on June 9th.

Open the decision.

Brazoria County Commissioners Court voted 5 to 0 to deny the reinvestment zone that four data center and power plant abatement applications depended on. What happens next?

No future date is on the record. The last dated step on it was ordered on March 10th.

Open the decision.

Brazos County Commissioners Court assigns the RELLIS data center tax abatement to ThisWay Global after the original developer's bankruptcy. What happens next?

No future date is on the record. The last dated step on it was hearing on August 18th.

Open the decision.

Brownsville takes up a temporary moratorium on data centers after staff tells the commission its code has no rules for them. What happens next?

No future date is on the record. The last dated step on it was hearing on September 1st.

Open the decision.

Carson County Commissioners Court approves a phased tax abatement agreement with Fermi America for the Project Matador HyperGrid campus. What happens next?

No future date is on the record. The last dated step on it was ordered on October 28th.

Open the decision.

Case managers beat Houston Methodist's discharge AI on the last day. What happens next?

No future date is on the record. The last dated step on it was filed on September 3rd.

Open the decision.

City of Taylor's notice of an amended Compal tax abatement is no longer posted, and no outcome is published. What happens next?

No future date is on the record. The last dated step on it was hearing on August 13th.

Open the decision.

College Station City Council votes 4 to 2 to keep its Flock plate reader cameras on state and city roads. What happens next?

No future date is on the record. The last dated step on it was decided on September 24th.

Open the decision.

Conroe City Council fell short of the votes needed to put its Flock camera contract on the November ballot. What happens next?

No future date is on the record. The last dated step on it was statutory deadline on August 17th.

Open the decision.

Corpus Christi City Council directed staff to write a zoning amendment prohibiting data centers in every zoning district and to prepare a moratorium process. What happens next?

No future date is on the record. The last dated step on it was ordered on July 21st.

Open the decision.

DIR must run an AI regulatory sandbox letting state agencies test systems outside normal rules. What happens next?

The next dated step is statutory deadline, on November 30th, in 60 days.

Open the decision.

Dallas Public Safety Committee sets a briefing on the police Flock plate reader program. What happens next?

No future date is on the record. The last dated step on it was hearing on September 8th.

Open the decision.

Dallas issues its first code citations from the AI cameras on its brush trucks. What happens next?

The next dated step is hearing, on October 19th, in 18 days.

Open the decision.

Denton City Council takes up a data center moratorium resolution and a schedule of the public hearings it would require. What happens next?

No future date is on the record. The last dated step on it was hearing on August 18th.

Open the decision.

ERCOT starts sending the Batch Zero questionnaires, and a data center that does not answer comes off the list. What happens next?

No future date is on the record. The last dated step on it was filed on September 9th.

Open the decision.

ERCOT tells its board that AI training loads can fatigue grid generators and drafts a limit on how fast their power draw may swing. What happens next?

No future date is on the record. The last dated step on it was passed on September 15th.

Open the decision.

El Paso City Council adopted a letter asking Governor Abbott to clarify his data center directives. What happens next?

No future date is on the record. The last dated step on it was decided on August 18th.

Open the decision.

El Paso City Council adopts a Data Center Policy Framework requiring a Special Permit for hyperscale projects. What happens next?

No future date is on the record. The last dated step on it was ordered on July 20th.

Open the decision.

El Paso City Council amends its state legislative agenda to seek protection for residential ratepayers from data center utility costs. What happens next?

No future date is on the record. The last dated step on it was ordered on June 23rd.

Open the decision.

El Paso City Council approves two plate reader items as revised, with the amendment text unpublished. What happens next?

No future date is on the record. The last dated step on it was decided on September 15th.

Open the decision.

El Paso passes two plate reader items as revised, filed to take city-sited readers down and bar new contracts. What happens next?

No future date is on the record. The last dated step on it was decided on September 15th.

Open the decision.

Energy Department funds a synthetic underground test pit at a Navasota drilling site to prove out mining automation. What happens next?

No future date is on the record. The last dated step on it was decided on September 9th.

Open the decision.

Energy Department research arm funds a Houston led team using AI to search for new magnet materials. What happens next?

No future date is on the record. The last dated step on it was ordered on September 1st.

Open the decision.

FAA takes comment until October 11th on letting Zipline fly drone deliveries around the clock over five Texas metros. What happens next?

The next dated step is comment closes, on October 11th, in ten days.

Open the decision.

Federal comment window has closed on NRC reactor licensing and siting modernization. What happens next?

No future date is on the record. The last dated step on it was comment closes on August 31st.

Open the decision.

Federal comment window has closed on adding AI questions to the American Time Use Survey. What happens next?

No future date is on the record. The last dated step on it was comment closes on September 8th.

Open the decision.

Federal commodities regulator opens comment on trading derivatives whose underlying commodity is compute. What happens next?

The next dated step is comment closes, on October 20th, in 19 days.

Open the decision.

Federal energy department opens comment on securing the grid and names AI as why demand grew, closing October 9th. What happens next?

The next dated step is comment closes, on October 9th, in eight days.

Open the decision.

Federal investigators opened a defect evaluation into a driverless system after crashes in Dallas and Austin. What happens next?

No future date is on the record. The last dated step on it was filed on May 6th.

Open the decision.

Federal regulators open an audit of how Tesla certified the Cybercab, on the day commercial deployment began in Austin. What happens next?

No future date is on the record. The last dated step on it was filed on September 3rd.

Open the decision.

Federal survey office asks whether the household internet survey should start measuring AI use, closing November 9th. What happens next?

The next dated step is comment closes, on November 9th, in 39 days.

Open the decision.

Fort Worth City Council unanimously began a 90 day data center moratorium and adopted grid filing requirements over one dissent. What happens next?

The next dated step is effective, on February 16th, in 138 days.

Open the decision.

Four Texas campuses took roles in the Energy Department's AI for science program. What happens next?

No future date is on the record. The last dated step on it was decided on July 22nd.

Open the decision.

Frontera's queues close permanently on October 1st, 2026. What happens next?

No future date is on the record. The last dated step on it was effective on October 1st.

Open the decision.

Governor Abbott directs the utility commission and ERCOT to audit every data center in the interconnection queue before any advances. What happens next?

The next dated step is statutory deadline, on December 10th, in 70 days.

Open the decision.

Governor directs the environmental agency to issue no data center permits until the grid audit is done. What happens next?

The next dated step is administrative deadline, on October 19th, in 18 days.

Open the decision.

Governor directs the water board to enforce the state water use survey against data centers that did not return it. What happens next?

The next dated step is administrative deadline, on October 14th, in 13 days.

Open the decision.

Governor orders state agencies to pause funding for Flock plate reader cameras. What happens next?

No future date is on the record. The last dated step on it was ordered on August 28th.

Open the decision.

Grid operator asks the water board's questions and gives data centers until October 12th. What happens next?

The next dated step is administrative deadline, on October 12th, in eleven days.

Open the decision.

Grid operator weighs a year's grace for data center cooling equipment on ride-through rules. What happens next?

No future date is on the record. The last dated step on it was filed on July 21st.

Open the decision.

Guadalupe County Commissioners Court unanimously approves ending the county's Flock Safety license plate reader contract. What happens next?

No future date is on the record. The last dated step on it was ordered on August 4th.

Open the decision.

Harlingen Waterworks System board approves an effluent water supply agreement with RGV Property LLC for a proposed data center. What happens next?

No future date is on the record. The last dated step on it was ordered on September 22nd.

Open the decision.

Harris County Commissioners Court renewed its Flock Group license plate reader and sound detection contract, then amended it to run county-wide. What happens next?

No future date is on the record. The last dated step on it was ordered on July 9th.

Open the decision.

Hays County Commissioners Court adopted a 180-day emergency water review period for high water use developments and created a review board. What happens next?

No future date is on the record. The last dated step on it was ordered on June 23rd.

Open the decision.

Hays County posts the sheriff's promise not to switch on AI report writing without coming back to the court. What happens next?

No future date is on the record. The last dated step on it was decided on September 15th.

Open the decision.

Hays County takes up a policy on how it governs AI in surveillance. What happens next?

No future date is on the record. The last dated step on it was hearing on September 8th.

Open the decision.

Homeland Security tested facial biometric capture on pedestrians walking out of the country at the Progreso International Bridge. What happens next?

No future date is on the record. The last dated step on it was ordered on September 1st.

Open the decision.

House Public Health held an interim hearing on artificial intelligence use in health care. What happens next?

No future date is on the record. The last dated step on it was hearing on August 20th.

Open the decision.

House State Affairs held an interim hearing on data center development and the proposed 765 kV transmission lines. What happens next?

No future date is on the record. The last dated step on it was hearing on August 19th.

Open the decision.

Houston ISD carried an artificial intelligence board policy to a second reading. What happens next?

No future date is on the record. The last dated step on it was hearing on August 13th.

Open the decision.

Houston Methodist put an imaging AI in front of its radiologists and says out loud that it is imperfect. What happens next?

No future date is on the record. The last dated step on it was decided on June 29th.

Open the decision.

Houston academic physician group moves from two ambient AI pilots toward one unified documentation platform. What happens next?

No future date is on the record. The last dated step on it was filed on September 9th.

Open the decision.

Houston-Galveston Area Council put AI consulting services on its HGACBuy purchasing catalog under contract AI05-26. What happens next?

No future date is on the record. The last dated step on it was effective on May 1st.

Open the decision.

Judges back El Paso Electric's gas plant for Meta only if other customers don't pay. What happens next?

No future date is on the record. The last dated step on it was filed on September 23rd.

Open the decision.

Justice Department takes comment on a judgment barring a Frisco apartment manager from rent software fed by rivals' data. What happens next?

The next dated step is comment closes, on November 17th, in 47 days.

Open the decision.

Killeen Planning and Zoning Commission voted against a conditional use permit for a $30 million ONMINE data center. What happens next?

No future date is on the record. The last dated step on it was ordered on April 27th.

Open the decision.

Laredo City Council declined a data center moratorium, and its direction to write permanent rules has reached three agendas with no recorded action. What happens next?

No future date is on the record. The last dated step on it was hearing on August 11th.

Open the decision.

League City City Council ordered a November 3rd special election on whether police may keep using automated license plate reader cameras. What happens next?

The next dated step is effective, on November 3rd, in 33 days.

Open the decision.

Leander stops paying for its plate reader contract and says the police department is no longer using the cameras or the data. What happens next?

No future date is on the record. The last dated step on it was effective on September 4th.

Open the decision.

Lubbock County Commissioners Court passes a non binding disclosure resolution on large scale industrial development, four to one. What happens next?

No future date is on the record. The last dated step on it was ordered on August 10th.

Open the decision.

Lubbock starts the procedure for a 90 day data center moratorium after the 18 month petition fails. What happens next?

No future date is on the record. The last dated step on it was ordered on September 22nd.

Open the decision.

Memorial Hermann clinicians send Houston patients an AI drafted explanation of their own test results. What happens next?

No future date is on the record. The last dated step on it was decided on September 8th.

Open the decision.

NSF awarded Prairie View A and M a grant to let AI split up the grid optimization problem across processor cores. What happens next?

No future date is on the record. The last dated step on it was ordered on August 11th.

Open the decision.

NSF awarded UT Austin a grant to replace hand written robot safety rules with a model trained on demonstrated safe behavior. What happens next?

No future date is on the record. The last dated step on it was ordered on August 13th.

Open the decision.

NSF funds a Rice laboratory where a model designs the experiment and a robot runs it, bookable from anywhere. What happens next?

No future date is on the record. The last dated step on it was effective on August 1st.

Open the decision.

National Science Foundation awards Rice University a cooperative agreement for a self driving laboratory that designs its own semiconductor experiments. What happens next?

No future date is on the record. The last dated step on it was effective on August 1st.

Open the decision.

National Science Foundation awards Texas A and M a national user facility where robots and artificial intelligence design and test new metal alloys. What happens next?

No future date is on the record. The last dated step on it was effective on September 1st.

Open the decision.

National Science Foundation backs a Texas A&M tool that screens whether an alloy can exist before anyone makes it. What happens next?

No future date is on the record. The last dated step on it was ordered on September 4th.

Open the decision.

National Science Foundation funds Rice to let AI propose numerical algorithms only where a proof checker certifies them. What happens next?

No future date is on the record. The last dated step on it was effective on September 15th.

Open the decision.

National Science Foundation funds UT San Antonio and Texas A&M to adapt large language models on machines that can't afford to run them. What happens next?

The next dated step is effective, on January 1st, in 92 days.

Open the decision.

National Science Foundation funds a five year human and robot co-adaptation center at UT Austin. What happens next?

No future date is on the record. The last dated step on it was effective on September 1st.

Open the decision.

National Science Foundation funds an open access robot run alloy laboratory at Texas A&M that outside researchers may book. What happens next?

No future date is on the record. The last dated step on it was effective on September 1st.

Open the decision.

National Science Foundation names UT El Paso in the first round of CyberAICorps Scholarship for Service awards. What happens next?

No future date is on the record. The last dated step on it was ordered on July 28th.

Open the decision.

National Science Foundation puts UT Austin's supercomputing center in an operating role for the national AI research resource. What happens next?

No future date is on the record. The last dated step on it was decided on September 1st.

Open the decision.

PUCT Docket 59029, Oncor application for a second 765 kV line across ten west Texas counties. What happens next?

No future date is on the record. The last dated step on it was decided on August 28th.

Open the decision.

PUCT Docket 59315, Oncor application for a 765 kV transmission line across 22 counties. What happens next?

No future date is on the record. The last dated step on it was decided on August 28th.

Open the decision.

PUCT Project 58000, rulemaking to update ERCOT transmission cost recovery, comment deadline reached. What happens next?

No future date is on the record. The last dated step on it was comment closes on August 11th.

Open the decision.

PUCT Project 58482, proposed new rule on Large Load Demand Management Service, comment window now shut. What happens next?

No future date is on the record. The last dated step on it was filed on September 6th.

Open the decision.

PUCT adopts the SB 6 large load interconnection rule, requires $50,000 per megawatt of security and drops the interconnection fee. What happens next?

The next dated step is effective, on October 8th, in seven days.

Open the decision.

PUCT open meeting calendar published as a live feed through mid 2027. What happens next?

The next dated step is comment closes, on October 15th, in 14 days.

Open the decision.

PUCT opens the first five year review of the ERCOT system-wide offer caps, with comments due September 17th. What happens next?

No future date is on the record. The last dated step on it was comment closes on September 17th.

Open the decision.

PUCT told an Armstrong County AI data center to shed its whole load, then left those conditions in place. What happens next?

No future date is on the record. The last dated step on it was decided on August 31st.

Open the decision.

PUCT wildfire plan blueprint lists cameras suggested, not required. What happens next?

No future date is on the record. The last dated step on it was filed on April 10th.

Open the decision.

Pecos-Barstow-Toyah ISD's JETI agreement for the Energy Forge One power plant is executed and posted. What happens next?

No future date is on the record. The last dated step on it was filed on July 24th.

Open the decision.

Pflugerville orders a November election on charter amendments, one of them a section on the city's use of artificial intelligence. What happens next?

The next dated step is election, on November 3rd, in 33 days.

Open the decision.

Reeves County Emergency Services District No. 2 takes up a Chapter 312 abatement for a gas plant built to run data centers. What happens next?

No future date is on the record. The last dated step on it was hearing on March 25th.

Open the decision.

Richardson ISD drafts a legislative ask that puts classroom AI guidance first. What happens next?

The next dated step is decided, on October 15th, in 14 days.

Open the decision.

San Angelo City Council caps data center cooling water by ordinance. What happens next?

No future date is on the record. The last dated step on it was effective on June 16th.

Open the decision.

San Angelo sets reporting rules for data center coolant discharged into the city sewer. What happens next?

No future date is on the record. The last dated step on it was effective on June 2nd.

Open the decision.

San Angelo writes data centers into its zoning code and makes them a conditional use only. What happens next?

No future date is on the record. The last dated step on it was effective on May 19th.

Open the decision.

San Marcos City Council voted 4 to 3 to define data centers in its land development code and make them ineligible citywide. What happens next?

No future date is on the record. The last dated step on it was effective on June 16th.

Open the decision.

Science foundation funds a Texas A&M engineering station to build AI digital twins of small water systems. What happens next?

The next dated step is expires, on August 31st, in 1065 days.

Open the decision.

Senate Economic Development holds its reset hearing on AI and the Texas workforce on September 22nd. What happens next?

No future date is on the record. The last dated step on it was hearing on September 22nd.

Open the decision.

Senate Transportation held its August 25th hearing on how driverless vehicles are being deployed under SB 2807. What happens next?

No future date is on the record. The last dated step on it was hearing on August 25th.

Open the decision.

Senate Water, Agriculture and Rural Affairs has held both sittings on data center cooling water and published no recommendation. What happens next?

No future date is on the record. The last dated step on it was hearing on September 2nd.

Open the decision.

SpaceX will build the Terafab semiconductor plant in Grimes County on a state grant and two school district agreements. What happens next?

No future date is on the record. The last dated step on it was decided on August 6th.

Open the decision.

State technology agency publishes how it is implementing the four AI laws of the 89th Legislature. What happens next?

No future date is on the record. The last dated step on it was effective on August 14th.

Open the decision.

Statute requires state agencies and local governments to post standardized notice of AI systems. What happens next?

No future date is on the record. The last dated step on it was effective on September 1st.

Open the decision.

TCEQ canceled the Carson County public meeting on Fermi Equipment Holdco's new air permits and says it will be rescheduled. What happens next?

No future date is on the record. The last dated step on it was hearing on August 24th.

Open the decision.

TCEQ canceled the San Antonio notice and comment hearing on Vantage Data Centers TX11's air permit O4791. What happens next?

No future date is on the record. The last dated step on it was hearing on August 17th.

Open the decision.

TCEQ has four data center air permit applications posted with published public notices, including Crusoe's two Texas campuses. What happens next?

No future date is on the record. The last dated step on it was comment opens on August 14th.

Open the decision.

TCEQ issues preliminary decision and opens comment on Crusoe's gas power plant at the Abilene data center campus. What happens next?

No future date is on the record. The last dated step on it was ordered on August 5th.

Open the decision.

TRAIGA in force as Business and Commerce Code Chapter 552, enforceable only by the Attorney General. What happens next?

No future date is on the record. The last dated step on it was effective on January 1st.

Open the decision.

TRAIGA preempts city and county regulation of artificial intelligence. What happens next?

No future date is on the record. The last dated step on it was effective on January 1st.

Open the decision.

Tarrant Regional Water District says it has signed no water supply contract for a data center and that the Cedar Creek request was withdrawn. What happens next?

No future date is on the record. The last dated step on it was filed on July 27th.

Open the decision.

Temple Planning and Zoning Commission takes up a Unified Development Code amendment that would require a Conditional Use Permit for every future data center. What happens next?

No future date is on the record. The last dated step on it was hearing on August 17th.

Open the decision.

Texas A&M tells its campus to run AI through a university portal rather than a public chatbot. What happens next?

No future date is on the record. The last dated step on it was decided on August 31st.

Open the decision.

Texas Children's and UT Southwestern radiologists publish that imaging AI has largely skipped children. What happens next?

No future date is on the record. The last dated step on it was filed on September 9th.

Open the decision.

Texas Government Code Chapter 2054 carries three conflicting Subchapter S's on AI, with duplicated section numbers. What happens next?

No future date is on the record. The last dated step on it was effective on September 1st.

Open the decision.

Texas State University moves an AI pavement inspection method toward statewide highway use. What happens next?

No future date is on the record. The last dated step on it was decided on August 24th.

Open the decision.

Texas Water Development Board denied a petition to give data centers their own water demand category and adopted the 2027 State Water Plan the same day. What happens next?

No future date is on the record. The last dated step on it was ordered on July 23rd.

Open the decision.

Texas requires AI training for state and local government employees, and this is the first annual cycle. What happens next?

No future date is on the record. The last dated step on it was effective on September 1st.

Open the decision.

Texas requires a state authorization to run driverless vehicles commercially, with no fee, no expiry and no crash history asked. What happens next?

No future date is on the record. The last dated step on it was effective on May 28th.

Open the decision.

The Army funds a Rice research center on antenna arrays that carries AI as one of six disciplines. What happens next?

No future date is on the record. The last dated step on it was decided on August 4th.

Open the decision.

The Hays County Clerk asks the commissioners court to buy AI that writes the county's official minutes. What happens next?

No future date is on the record. The last dated step on it was hearing on September 15th.

Open the decision.

The House committee on government efficiency is charged with studying whether the state should use artificial intelligence to find fraud in its own spending. What happens next?

No future date is on the record. The last dated step on it was hearing on August 19th.

Open the decision.

The National Science Foundation funds a Texas A&M project to build AI digital twins of small and mid-sized water systems. What happens next?

The next dated step is expires, on August 31st, in 1065 days.

Open the decision.

The National Science Foundation funds a UT Austin center to put assistive robots into occupied homes, workplaces and care facilities. What happens next?

The next dated step is expires, on August 31st, in 1795 days.

Open the decision.

The National Science Foundation puts Texas Southern University in charge of one of five regional nodes in a new HBCU network for AI and quantum science. What happens next?

The next dated step is expires, on September 30th, in 730 days.

Open the decision.

The National Science Foundation puts the national AI research resource into standing operations, co-run from Austin. What happens next?

No future date is on the record. The last dated step on it was ordered on September 1st.

Open the decision.

The Supreme Court of Texas will hear argument on October 6th in a mandamus proceeding the court reporters' association has entered. What happens next?

The next dated step is hearing, on October 6th, in five days.

Open the decision.

The Texas A&M System's shared AI supercomputer enters the world list at number 66. What happens next?

No future date is on the record. The last dated step on it was ordered on June 1st.

Open the decision.

The University of North Texas takes a twenty million dollar gift and names a college of artificial intelligence after the donors. What happens next?

No future date is on the record. The last dated step on it was decided on September 8th.

Open the decision.

The University of Texas at Austin requires every course syllabus to state its AI policy. What happens next?

No future date is on the record. The last dated step on it was effective on August 24th.

Open the decision.

The board takes a required high school money course to final adoption, and the text it published names AI tools in three of its chapters. What happens next?

No future date is on the record. The last dated step on it was decided on September 4th.

Open the decision.

The grid operator sends every conditionally classified large load a questionnaire, with a notarized attestation and ten business days to answer. What happens next?

No future date is on the record. The last dated step on it was ordered on September 11th.

Open the decision.

The grid operator sets an October 6th workshop on how it would curtail a large load under Senate Bill 6. What happens next?

The next dated step is hearing, on October 6th, in five days.

Open the decision.

The grid operator tells providers which large loads it has provisionally placed in Batch Zero, and every placement carries a condition. What happens next?

No future date is on the record. The last dated step on it was ordered on September 3rd.

Open the decision.

Tom Green County Commissioners Court declines a Precinct 4 moratorium on data centers and large energy projects. What happens next?

No future date is on the record. The last dated step on it was ordered on June 2nd.

Open the decision.

Two Texas House committees take up data centers and AI in health care on August 19th and August 20th. What happens next?

No future date is on the record. The last dated step on it was hearing on August 20th.

Open the decision.

UT Arlington builds a federally funded AI tutor that withholds the answer and helps build Fort Worth police training on the same method. What happens next?

No future date is on the record. The last dated step on it was filed on September 10th.

Open the decision.

UT Arlington replaces its business analytics degrees with artificial intelligence degrees. What happens next?

No future date is on the record. The last dated step on it was decided on September 14th.

Open the decision.

UT Austin funds four fusion seed grants and says in its own release that the AI method offers limited guarantees. What happens next?

No future date is on the record. The last dated step on it was ordered on August 31st.

Open the decision.

UT Austin puts a computer science and AI course in the core every undergraduate takes. What happens next?

The next dated step is effective, on September 1st, in 335 days.

Open the decision.

UT San Antonio builds a solar powered flood sensor that runs its model on the chip rather than in the cloud. What happens next?

No future date is on the record. The last dated step on it was filed on September 8th.

Open the decision.

UT San Antonio builds a solar powered flood sensor that runs its model on the device instead of a server. What happens next?

No future date is on the record. The last dated step on it was filed on September 8th.

Open the decision.

UT System Board of Regents approved a School of Computing at UT Austin uniting computer science, information, statistics and data sciences. What happens next?

No future date is on the record. The last dated step on it was hearing on August 12th.

Open the decision.

UT System Board of Regents approves $25 million to finish San Pedro II for UTSA's College of AI, Cyber and Computing. What happens next?

No future date is on the record. The last dated step on it was ordered on May 20th.

Open the decision.

UT System Regents put the first billion dollars of the UT Dell Medical Center into the capital program. What happens next?

No future date is on the record. The last dated step on it was decided on August 12th.

Open the decision.

UTMB moved its Epic health record into Microsoft's cloud and named advanced technologies as the reason. What happens next?

No future date is on the record. The last dated step on it was ordered on August 13th.

Open the decision.

Utilities Code limits how the PUCT may direct ERCOT, and bars verbal directives. What happens next?

No future date is on the record. The last dated step on it was effective on June 8th.

Open the decision.

Utility commission approves a 765 kilovolt line from Somervell County to Howard County. What happens next?

No future date is on the record. The last dated step on it was decided on August 28th.

Open the decision.

Wichita Falls Planning and Zoning Commission approves a conditional use permit for a DataNovaX data center on Airport Drive. What happens next?

No future date is on the record. The last dated step on it was ordered on August 13th.

Open the decision.

Williamson County Commissioners Court granted Compal USA Technology a Chapter 312 abatement for a Georgetown server service center. What happens next?

The next dated step is statutory deadline, on February 18th, in 140 days.

Open the decision.

Young County Commissioners Court receives the Project Saltworks tax abatement application and ratifies a developer funded escrow for consultants. What happens next?

No future date is on the record. The last dated step on it was hearing on August 17th.

Open the decision.