A Houston oil producer buys into an AI vendor and commits its Ward County operations to the vendor's system. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

A data center developer tells its shareholders what the Batch Zero list did to five of its Texas projects, and one came back in a different class than it was filed in. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

A generative AI platform at UTMB reached the UT System Regents only on its third amendment, at $9,850,000, and now covers all seven health institutions. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

A machine scores the longer written answers on English STAAR first. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

A statewide poll finds most Texas voters oppose a data center in their own community for a second survey running. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

A three campus Texas trial tests whether a phone microphone held to the abdomen can count fetal movement by machine. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Amarillo City Council authorizes a twenty year water supply agreement selling city water to Fermi America's Project Matador. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Amazon and Wiwynn say they will expand the El Paso County plant that builds the racks going into AI data centers. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Amazon selects Austin for a factory building the robotics systems used in its warehouses, and the mayor says no incentives were requested. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

An MD Anderson and UT Medical Branch MRI model scored lower on patients it was not built on. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Angelina County Commissioners Court adopts Resolution 010-26 asking the Legislature for authority over data centers. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Archer County Commissioners Court unanimously denies a tax abatement for a Dynamo Ventures data center. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Asked for AI camera fire detections, Xcel counted cameras. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Austin City Council adopted Ordinance 20260423-029 creating City Code Chapter 2-19 on surveillance technology. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Austin City Council takes up a resolution to amend the land code for data centers. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Austin City Council takes up a resolution to write data centers into a land development code that has no definition of one. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Austin bars its city manager from buying any park camera or drone that depends on artificial intelligence. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Blanco-Pedernales Groundwater Conservation District signed a resolution asking the Legislature to clarify district authority over data centers. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Brazoria County Commissioners Court adopted a resolution stating conditions it wants on data center development. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Brazoria County Commissioners Court voted 5 to 0 to deny the reinvestment zone that four data center and power plant abatement applications depended on. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Brazos County Commissioners Court assigns the RELLIS data center tax abatement to ThisWay Global after the original developer's bankruptcy. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Brownsville takes up a temporary moratorium on data centers after staff tells the commission its code has no rules for them. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Carson County Commissioners Court approves a phased tax abatement agreement with Fermi America for the Project Matador HyperGrid campus. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Case managers beat Houston Methodist's discharge AI on the last day. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

City of Taylor's notice of an amended Compal tax abatement is no longer posted, and no outcome is published. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Comptroller's JETI current agreements list contains no data center project. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Conroe City Council fell short of the votes needed to put its Flock camera contract on the November ballot. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Corpus Christi City Council directed staff to write a zoning amendment prohibiting data centers in every zoning district and to prepare a moratorium process. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

DIR must run an AI regulatory sandbox letting state agencies test systems outside normal rules. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Dallas Public Safety Committee sets a briefing on the police Flock plate reader program. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Dallas issues its first code citations from the AI cameras on its brush trucks. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Denton City Council takes up a data center moratorium resolution and a schedule of the public hearings it would require. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

ERCOT starts sending the Batch Zero questionnaires, and a data center that does not answer comes off the list. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

ERCOT tells its board that AI training loads can fatigue grid generators and drafts a limit on how fast their power draw may swing. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

El Paso City Council adopted a letter asking Governor Abbott to clarify his data center directives. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

El Paso City Council adopts a Data Center Policy Framework requiring a Special Permit for hyperscale projects. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

El Paso City Council amends its state legislative agenda to seek protection for residential ratepayers from data center utility costs. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

El Paso City Council approves two plate reader items as revised, with the amendment text unpublished. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

El Paso passes two plate reader items as revised, filed to take city-sited readers down and bar new contracts. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Energy Department funds a synthetic underground test pit at a Navasota drilling site to prove out mining automation. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Energy Department research arm funds a Houston led team using AI to search for new magnet materials. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Federal comment window has closed on NRC reactor licensing and siting modernization. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Federal comment window has closed on adding AI questions to the American Time Use Survey. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Federal energy department opens comment on securing the grid and names AI as why demand grew, closing October 9th. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Federal investigators opened a defect evaluation into a driverless system after crashes in Dallas and Austin. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Federal regulators open an audit of how Tesla certified the Cybercab, on the day commercial deployment began in Austin. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Federal survey office asks whether the household internet survey should start measuring AI use, closing November 9th. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Fort Worth City Council unanimously began a 90 day data center moratorium and adopted grid filing requirements over one dissent. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Four Texas campuses took roles in the Energy Department's AI for science program. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Frontera's queues close permanently on October 1st, 2026. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Governor Abbott directs the utility commission and ERCOT to audit every data center in the interconnection queue before any advances. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Governor orders state agencies to pause funding for Flock plate reader cameras. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Grid operator asks the water board's questions and gives data centers until October 12th. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Grid operator weighs a year's grace for data center cooling equipment on ride-through rules. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Guadalupe County Commissioners Court unanimously approves ending the county's Flock Safety license plate reader contract. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Harlingen Waterworks System board approves an effluent water supply agreement with RGV Property LLC for a proposed data center. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Harris County Commissioners Court renewed its Flock Group license plate reader and sound detection contract, then amended it to run county-wide. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Hays County Commissioners Court adopted a 180-day emergency water review period for high water use developments and created a review board. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Hays County posts the sheriff's promise not to switch on AI report writing without coming back to the court. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Hays County takes up a policy on how it governs AI in surveillance. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Homeland Security tested facial biometric capture on pedestrians walking out of the country at the Progreso International Bridge. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

House Public Health held an interim hearing on artificial intelligence use in health care. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

House State Affairs held an interim hearing on data center development and the proposed 765 kV transmission lines. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Houston ISD carried an artificial intelligence board policy to a second reading. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Houston Methodist put an imaging AI in front of its radiologists and says out loud that it is imperfect. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Houston academic physician group moves from two ambient AI pilots toward one unified documentation platform. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Houston-Galveston Area Council put AI consulting services on its HGACBuy purchasing catalog under contract AI05-26. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Judges back El Paso Electric's gas plant for Meta only if other customers don't pay. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Killeen Planning and Zoning Commission voted against a conditional use permit for a $30 million ONMINE data center. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Laredo City Council declined a data center moratorium, and its direction to write permanent rules has reached three agendas with no recorded action. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

League City City Council ordered a November 3rd special election on whether police may keep using automated license plate reader cameras. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Leander stops paying for its plate reader contract and says the police department is no longer using the cameras or the data. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Lubbock County Commissioners Court passes a non binding disclosure resolution on large scale industrial development, four to one. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Lubbock starts the procedure for a 90 day data center moratorium after the 18 month petition fails. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Memorial Hermann clinicians send Houston patients an AI drafted explanation of their own test results. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

NSF awarded Prairie View A and M a grant to let AI split up the grid optimization problem across processor cores. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

NSF awarded UT Austin a grant to replace hand written robot safety rules with a model trained on demonstrated safe behavior. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

NSF funds a Rice laboratory where a model designs the experiment and a robot runs it, bookable from anywhere. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

National Science Foundation awards Rice University a cooperative agreement for a self driving laboratory that designs its own semiconductor experiments. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

National Science Foundation awards Texas A and M a national user facility where robots and artificial intelligence design and test new metal alloys. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

National Science Foundation backs a Texas A&M tool that screens whether an alloy can exist before anyone makes it. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

National Science Foundation funds Rice to let AI propose numerical algorithms only where a proof checker certifies them. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

National Science Foundation funds UT San Antonio and Texas A&M to adapt large language models on machines that can't afford to run them. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

National Science Foundation funds a five year human and robot co-adaptation center at UT Austin. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

National Science Foundation funds an open access robot run alloy laboratory at Texas A&M that outside researchers may book. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

National Science Foundation names UT El Paso in the first round of CyberAICorps Scholarship for Service awards. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

National Science Foundation puts UT Austin's supercomputing center in an operating role for the national AI research resource. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

PUCT Docket 59029, Oncor application for a second 765 kV line across ten west Texas counties. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

PUCT Docket 59315, Oncor application for a 765 kV transmission line across 22 counties. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

PUCT Project 58000, rulemaking to update ERCOT transmission cost recovery, comment deadline reached. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

PUCT Project 58482, proposed new rule on Large Load Demand Management Service, comment window now shut. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

PUCT adopts the SB 6 large load interconnection rule, requires $50,000 per megawatt of security and drops the interconnection fee. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

PUCT open meeting calendar published as a live feed through mid 2027. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

PUCT opens the first five year review of the ERCOT system-wide offer caps, with comments due September 17th. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

PUCT told an Armstrong County AI data center to shed its whole load, then left those conditions in place. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Pecos-Barstow-Toyah ISD's JETI agreement for the Energy Forge One power plant is executed and posted. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Pflugerville orders a November election on charter amendments, one of them a section on the city's use of artificial intelligence. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Reeves County Emergency Services District No. 2 takes up a Chapter 312 abatement for a gas plant built to run data centers. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Richardson ISD drafts a legislative ask that puts classroom AI guidance first. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

San Angelo City Council caps data center cooling water by ordinance. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

San Angelo sets reporting rules for data center coolant discharged into the city sewer. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

San Angelo writes data centers into its zoning code and makes them a conditional use only. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

San Marcos City Council voted 4 to 3 to define data centers in its land development code and make them ineligible citywide. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Science foundation funds a Texas A&M engineering station to build AI digital twins of small water systems. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Senate Economic Development holds its reset hearing on AI and the Texas workforce on September 22nd. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Senate Transportation held its August 25th hearing on how driverless vehicles are being deployed under SB 2807. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Senate Water, Agriculture and Rural Affairs has held both sittings on data center cooling water and published no recommendation. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

SpaceX will build the Terafab semiconductor plant in Grimes County on a state grant and two school district agreements. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

State technology agency publishes how it is implementing the four AI laws of the 89th Legislature. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Statute requires state agencies and local governments to post standardized notice of AI systems. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

TCEQ canceled the Carson County public meeting on Fermi Equipment Holdco's new air permits and says it will be rescheduled. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

TCEQ canceled the San Antonio notice and comment hearing on Vantage Data Centers TX11's air permit O4791. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

TCEQ has four data center air permit applications posted with published public notices, including Crusoe's two Texas campuses. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

TCEQ issues preliminary decision and opens comment on Crusoe's gas power plant at the Abilene data center campus. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

TRAIGA in force as Business and Commerce Code Chapter 552, enforceable only by the Attorney General. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

TRAIGA preempts city and county regulation of artificial intelligence. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Tarrant Regional Water District says it has signed no water supply contract for a data center and that the Cedar Creek request was withdrawn. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Temple Planning and Zoning Commission takes up a Unified Development Code amendment that would require a Conditional Use Permit for every future data center. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Texas A&M tells its campus to run AI through a university portal rather than a public chatbot. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Texas Children's and UT Southwestern radiologists publish that imaging AI has largely skipped children. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Texas Government Code Chapter 2054 carries three conflicting Subchapter S's on AI, with duplicated section numbers. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

Texas State University moves an AI pavement inspection method toward statewide highway use. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Texas Water Development Board denied a petition to give data centers their own water demand category and adopted the 2027 State Water Plan the same day. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Texas requires AI training for state and local government employees, and this is the first annual cycle. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

The Army funds a Rice research center on antenna arrays that carries AI as one of six disciplines. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

The Hays County Clerk asks the commissioners court to buy AI that writes the county's official minutes. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

The House committee on government efficiency is charged with studying whether the state should use artificial intelligence to find fraud in its own spending. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

The National Science Foundation funds a Texas A&M project to build AI digital twins of small and mid-sized water systems. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

The National Science Foundation funds a UT Austin center to put assistive robots into occupied homes, workplaces and care facilities. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

The National Science Foundation puts Texas Southern University in charge of one of five regional nodes in a new HBCU network for AI and quantum science. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

The National Science Foundation puts the national AI research resource into standing operations, co-run from Austin. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

The Texas A&M System's shared AI supercomputer enters the world list at number 66. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

The University of North Texas takes a twenty million dollar gift and names a college of artificial intelligence after the donors. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

The University of Texas at Austin requires every course syllabus to state its AI policy. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

The board takes a required high school money course to final adoption, and the text it published names AI tools in three of its chapters. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

The grid operator sends every conditionally classified large load a questionnaire, with a notarized attestation and ten business days to answer. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

The grid operator sets an October 6th workshop on how it would curtail a large load under Senate Bill 6. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

The grid operator tells providers which large loads it has provisionally placed in Batch Zero, and every placement carries a condition. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Tom Green County Commissioners Court declines a Precinct 4 moratorium on data centers and large energy projects. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Two Texas House committees take up data centers and AI in health care on August 19th and August 20th. Is it on the ERCOT grid?

No. It sits outside the ERCOT interconnection.

Open the decision.

UT Arlington builds a federally funded AI tutor that withholds the answer and helps build Fort Worth police training on the same method. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

UT Arlington replaces its business analytics degrees with artificial intelligence degrees. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

UT Austin funds four fusion seed grants and says in its own release that the AI method offers limited guarantees. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

UT Austin puts a computer science and AI course in the core every undergraduate takes. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

UT San Antonio builds a solar powered flood sensor that runs its model on the chip rather than in the cloud. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

UT San Antonio builds a solar powered flood sensor that runs its model on the device instead of a server. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

UT Southwestern says AI now does most of the grading on its medical students' clinical exam notes. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

UT System Board of Regents approved a School of Computing at UT Austin uniting computer science, information, statistics and data sciences. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

UT System Board of Regents approves $25 million to finish San Pedro II for UTSA's College of AI, Cyber and Computing. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

UT System Regents put the first billion dollars of the UT Dell Medical Center into the capital program. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

UTMB moved its Epic health record into Microsoft's cloud and named advanced technologies as the reason. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

University of North Texas opens an undergraduate artificial intelligence degree. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Utilities Code limits how the PUCT may direct ERCOT, and bars verbal directives. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Utility commission approves a 765 kilovolt line from Somervell County to Howard County. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Wichita Falls Planning and Zoning Commission approves a conditional use permit for a DataNovaX data center on Airport Drive. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Williamson County Commissioners Court granted Compal USA Technology a Chapter 312 abatement for a Georgetown server service center. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.

Young County Commissioners Court receives the Project Saltworks tax abatement application and ratifies a developer funded escrow for consultants. Is it on the ERCOT grid?

Yes. It sits inside the ERCOT interconnection.

Open the decision.